Large-Specification Busway Continuous Vertical Installation Solution
2021-07-22

Case summary:
Hundreds of meters of 6300A five-wire copper compact busway, with a net weight of over 120 kg per meter, needed to be installed vertically from the first floor through a shaft to the top of the fifth floor. The floor-to-floor height was 8.8 meters.
After research, calculation, and discussion, Jiuwei Busway’s consulting team proposed a climbing installation approach. However, this method would significantly increase cost for the client. Could there be a safer and more reliable alternative with less additional cost?
Submission requirements:
1. The case should be a dense copper busway project that has been implemented for more than two years, with contact information from the user side and on-site verification.
2. It should be a 5000A or higher copper compact busway project with continuous vertical shaft installation and a vertical height exceeding 40 meters using a method other than climbing installation.
Hundreds of meters of 6300A five-wire copper compact busway, with a net weight of over 120 kg per meter, needed to be installed vertically from the first floor through a shaft to the top of the fifth floor. The floor-to-floor height was 8.8 meters.
After research, calculation, and discussion, Jiuwei Busway’s consulting team proposed a climbing installation approach. However, this method would significantly increase cost for the client. Could there be a safer and more reliable alternative with less additional cost?
Submission requirements:
1. The case should be a dense copper busway project that has been implemented for more than two years, with contact information from the user side and on-site verification.
2. It should be a 5000A or higher copper compact busway project with continuous vertical shaft installation and a vertical height exceeding 40 meters using a method other than climbing installation.
Other Projects
- Meeting with Huatong Group on Smart Busway Solutions
2023-05-01 - Construction Begins for Jinghe Huicui Plaza Project in Xixian New Area
2023-04-03 - Zhuhai Medical Equipment Factory Busway Project Completed
2022-04-24 - Busway Engineer
2021-11-22 - Yantai Bay International Convention Center Busway Project Completed
2021-10-27 - Jinan Power Supply Bureau Central Air Conditioning Retrofit Busway Project Completed
2021-04-30