Home > News > Large-Specification Busway Continuous Vertical Installation Solution

Large-Specification Busway Continuous Vertical Installation Solution

2021-07-22

Large-Specification Busway Continuous Vertical Installation Solution
 Challenge:
        Several hundred meters of 6300A five-wire copper Compact Busway, each meter weighing over 120 kg net, needed to be installed vertically through a shaft from the first floor to the top of the fifth floor, with each floor height at 8.8 meters.
        After research, calculation, and discussion, the Jiuwei Busway advisory team proposed using the climbing installation method — but this would add significant cost for the customer. Beyond the climbing method, is there a safe, reliable installation solution with less added cost?
        Submission requirements:
        1. Must be a compact copper busway project that has been in operation for more than two years, with the customer's contact information provided for on-site verification.
        2. Must involve 5000A or higher copper Compact Busway, installed continuously through a vertical shaft exceeding 40 meters in height, using an installation method other than the climbing method.

<< Back to List

Other News